Labour cost index 2007


  • Statistical Series
  • 12 March 2008
  • Vol 93, Issue 16
  • ISSN: 1670-4509


Download PDF
The increase in total labour costs per working hour between the years 2006 and 2007 ranges from 6.3% in construction to 9.6% in manufacturing. During the same period total labour costs per working hour increased by 6.4% in wholesale and retail trade; repair and 7.4% in transport, storage and communication.

Go back